SIEMENS TRANSPORTATION

KEY POINTS:

  • ROI = Under 18 months.
  • 1,141,113.06 – KwH 08/09.
  • 75 tonnes – Approx. annual CO2 reduction
  • £12,106 – First year saving.
  • 709,956.00 – KwH 09/10.
  • £19,799 – Full system & installation cost.
  • System – 26 Airius Model 45 units.
Download PDF Case Study

ACTON RAIL MAINTENANCE –DESTRATIFICATION FAN SYSTEMS

Siemens Transportation Systems Ltd. contacted Airius to address the high energy costs in their Acton Rail Maintenance Shed, which was unable to reach acceptable comfort levels for staff despite the heating running continuously.

Following installation of the Airius system desired conditions were easily achieved and maintained, yet the workload from the HVAC system was also reduced, so much so that the system paid for itself in under 18 months.